defr Glossar

Visibility determination

Visibility in road tunnels is determined by photometric measurement of the extinction coefficient K. According to Koschmieder, this coefficient bears the following relation to the standard visibility LV:

$L_{V} = \frac{3.9}{K}$


Instruments exist that determine the light loss over a certain distance (3 to 5 m) by measuring the light intensities I0 (before the detection zone) and I (after passing through the detection zone). In practical use, however, these transmitted light instruments call for very precise installation and considerable servicing effort.

Visibility monitor within the traffic zone (monitor 1, in-situ), outside the traffic zone (monitor 1, extractive) and smoke detector within the tunnel ceiling (instrument 2)
Fig. 55: Visibility monitor within the traffic zone (monitor 1, in-situ), outside the traffic zone (monitor 1, extractive) and smoke detector within the tunnel ceiling (instrument 2)

A much more practical method is measurement of the scattered light rather than the transmitted light. Instead of measuring the attenuation over a certain distance, it measures the intensity of the light scattered sideways by the illuminated dust particles. Because there is no need for a long measuring distance, measurement can take place right inside the instrument. The air is drawn out of the tunnel and fed to the instrument, thus eliminating all the drawbacks of mounting it inside the tunnel. The photometer is placed at an accessible spot outside the traffic zone – as far as 500 m away from the sampling point if need be.

It is also advantageous to be able to heat the air ahead of the flow cell to eliminate the effects of fog and moisture. In addition, a switching system can be installed to link a number of measuring points with a single visibility meter.

Index

Contact distribution partner

{{selectedCountry.Name}} {{country.Name}}

Please select your businessarea

{{ba.Name}}

Please select

{{area.Name}}

Please select your businessarea

{{ba.Name}}
{{selectedCountry.Name}} {{country.Name}}
{{vm.getBusinessAreaStringByVendor(vendor)}} {{area.Name}}
{{vm.getBusinessAreaStringByVendor(vendor)}}
Leonardo Pio
Responsible for the application: Water, Industrial Processes, Beverages & Food for the regions: AG, LU, NW, OW, VS, BS, BL, SO, BE, FR, NE, VD, GE and JU
Andreas Corradini
Responsible for the application: Water, Industrial Processes, Beverages & Food for the regions: TI, GR, UR, GL, SZ, ZG, ZH, SH, SG, TG, AR and AI Traffic & Environment: whole Switzerland
Ihr Businesspartner für Getränke & Lebensmittel:
Für Wasser, Industrielle Prozesse, Verkehr & Umwelt kontaktieren Sie unseren Hauptsitz.

Your distribution partner for beverages & food:
For water, industrial processes, traffic & environment please contact our headquarters

Ihr Businesspartner für Getränke & Lebensmittel:
Für Wasser, Industrielle Prozesse, Verkehr & Umwelt kontaktieren Sie unseren Hauptsitz.

Your distribution partner for beverages & food:
For water, industrial processes, traffic & environment please contact our headquarters

Contact headquarters

Felix Joller
Sales Manager ScrubberGuard
Öffnungszeiten:
Montag–Freitag 08:00–12:00 und 13:30–17:00
Feiertage & Betriebsferien:
Seppitag: 19. März 2024, Ostern: 29. März – 01. April 2024, Auffahrt: 09. Mai 2024, Pfingstmontag: 20. Mai 2024, Fronleichnam: 30. Mai 2024, Bundesfeiertag: 01. August 2024, Maria Himmelfahrt: 15. August 2024, Allerheiligen: 01. November 2024, Maria Empfängnis: 08. Dezember 2024, Betriebsferien: 24. Dezember 2024 – 02. Januar 2025
Opening hours:
Monday–Friday 08:00am–12:00pm und 1:30pm–5:00pm
Public & company holidays:
St Joseph's Day: 19. March 2024, Easter: 29. March – 01. April 2024, Ascension Day: 09. May 2024, Whit Monday: 20. May 2024, Corpus Christi: 30. May 2024, Federal Holiday: 01. August 2024, Assumption Day: 15. August 2024, All Saints Day: 01. November 2024, Conception of Mary: 08. December 2024, Company holidays: 24. December 2024 – 02. January 2025