de Glossar

IHZ Innovationspreis 2020

{{product.Name}} – {{product.Text}} Zertifizierungslogo SVGW - der Fachverband für Wasser-, Gas- und Fernwärmeversorger
New Soon Temp
{{product.Name}} – {{product.Text}}
Zertifizierungslogo SVGW - der Fachverband für Wasser-, Gas- und Fernwärmeversorger
{{product.Name}} – {{product.Text}}
The product is removed since {{ product.KillingDate | date : 'MM/dd/yyyy' }}.

{{meta('parent').DisplayName[meta('hlFull')]}}

Bearbeiten

Absorption Measuring Instrument bypass

The ColorPlus measures the colour/absorbance online at up to three different wavelengths. The bypass measuring cell has been specifically designed for applications within the water industry. Depending on the configuration it allows measuring DOC (UV absorption) and colour (Hazen) simultaneously and to compensate turbidity. Soiling of the flow cell is measured by means of a compensation glass in the interior of the flow cell. The effect of cell soiling is greatly reduced internally; constant and precise measured values are guaranteed. The user is alerted if the cell has to be cleaned. The cover of the flow cell can be opened without tools and allows simple access for cleaning the flow cell. For inspecting the instrument, checking units on the basis of reference filters can easily be inserted. Operation is done intuitive using the intelligent control system SICON via touch screen technology and colour display. Values, graphs, alarm and status messages can be presented. An internal data logger allows recalling and displaying measured data from the last 32 days. A variety of analogue and digital interfaces allows smooth system integration and control.

  • {{f.Text}}

Specification

MEPC.259(68) DNV-GL Statement of Compliance MEPC.259(68) DNV-GL Statement of Compliance Type Approval from Lloyd’s Register NIPPON KAIJI KYOKAI ClassNK MEPC.259(68)
MEPC.259(68) DNV-GL Statement of Compliance MEPC.259(68) DNV-GL Statement of Compliance Type Approval from Lloyd’s Register NIPPON KAIJI KYOKAI ClassNK MEPC.259(68)
{{i.Value}}
Control Units
{{c.Name}}
Download data sheet
{{d.DocumentTitle}}
Download
Request
{{vm.getLanguageName(rev.LanguageCode).LanguageName}}
{{vm.getRevisionFileTypeDescription(rev)}}
{{d.DocumentTypeName}}
{{d.DocumentTitle}}
{{rev.DocumentFileSrcName}} Rev. {{rev.DocumentFileSrcRevName}}
Details
Edit Sorting

Contact distribution partner

{{selectedCountry.Name}} {{country.Name}}

Please select your businessarea

{{ba.Name}}

Please select

{{area.Name}}

Please select your businessarea

{{ba.Name}}
{{selectedCountry.Name}} {{country.Name}}
{{vm.getBusinessAreaStringByVendor(vendor)}} {{area.Name}}
{{vm.getBusinessAreaStringByVendor(vendor)}}
Leonardo Pio
Responsible for the application: Water, Industrial Processes, Beverages & Food for the regions: AG, LU, NW, OW, VS, BS, BL, SO, BE, FR, NE, VD, GE and JU
Andreas Corradini
Responsible for the application: Water, Industrial Processes, Beverages & Food for the regions: TI, GR, UR, GL, SZ, ZG, ZH, SH, SG, TG, AR and AI Traffic & Environment: whole Switzerland
Ihr Businesspartner für Getränke & Lebensmittel:
Für Wasser, Industrielle Prozesse, Verkehr & Umwelt kontaktieren Sie unseren Hauptsitz.

Your distribution partner for beverages & food:
For water, industrial processes, traffic & environment please contact our headquarters

Ihr Businesspartner für Getränke & Lebensmittel:
Für Wasser, Industrielle Prozesse, Verkehr & Umwelt kontaktieren Sie unseren Hauptsitz.

Your distribution partner for beverages & food:
For water, industrial processes, traffic & environment please contact our headquarters

Contact headquarters

Ralf Isenberg
Sales Manager ScrubberGuard
Öffnungszeiten:
Montag–Freitag 08:00–12:00 und 13:30–17:00
Feiertage & Betriebsferien:
Seppitag: 19. März 2024, Ostern: 29. März – 01. April 2024, Auffahrt: 09. Mai 2024, Pfingstmontag: 20. Mai 2024, Fronleichnam: 30. Mai 2024, Bundesfeiertag: 01. August 2024, Maria Himmelfahrt: 15. August 2024, Allerheiligen: 01. November 2024, Maria Empfängnis: 08. Dezember 2024, Betriebsferien: 24. Dezember 2024 – 02. Januar 2025
Opening hours:
Monday–Friday 08:00am–12:00pm und 1:30pm–5:00pm
Public & company holidays:
St Joseph's Day: 19. March 2024, Easter: 29. March – 01. April 2024, Ascension Day: 09. May 2024, Whit Monday: 20. May 2024, Corpus Christi: 30. May 2024, Federal Holiday: 01. August 2024, Assumption Day: 15. August 2024, All Saints Day: 01. November 2024, Conception of Mary: 08. December 2024, Company holidays: 24. December 2024 – 02. January 2025